Batch 2 

Production Report:

✓  Material Sourcing (10/12/20)

✓ Component Sourcing (11/6/20)

✓ Frame Building (11/25/20)

✓ Frame QC Audit (1/9/21)

✓ Frame Painting (1/27)

✓ Final Assembly (1/27-2/18)

Testing & Quality Control (estimate: 2/18-2/25)

VIN Registration (estimate: 2/23-2/28)

Shipping (estimate: 2/25-3/10)