Batch 2
Production Report:
✓ Material Sourcing (10/12/20)
✓ Component Sourcing (11/6/20)
✓ Frame Building (11/25/20)
✓ Frame QC Audit (1/9/21)
✓ Frame Painting (1/27)
✓ Final Assembly (1/27-2/18)
Testing & Quality Control (estimate: 2/18-2/25)
VIN Registration (estimate: 2/23-2/28)
Shipping (estimate: 2/25-3/10)